Jump to content

Office Tower In Downtown At 1111 Travis St.


burgower4

Recommended Posts

I think Tiger meant "Main at Dallas" and "Main at Lamar".  Not "Lamar at Dallas".  Those streets don't cross.  Easy Mistake.

 

Actually, they almost do meet - but it's in the block between Discovery Green and the Hilton, where they rerouted Lamar as part of building DG.  :rolleyes:

Link to comment
Share on other sites

  • 2 weeks later...

What's amazing to me is how some projects, with three tower cranes in a small footprint no less, can only muster up one floor every couple of months, while other projects in Houston seem to rocket skyward overnight.

Poor management and organization I would guess.

Link to comment
Share on other sites

Or an efficient use of limited resources. I had a hard hat on for the concrete pour here and can tell you the guys in charge of this developement are complete proffesionals.

 

I'll leave you with this "You can pay 130 guys full figure "boomtown salaries" to get the job done right. Or you could pay 300 guys a little over minimum wage and throw floors up.

 

Lastly, you throw apartments and pre-fabbed concrete buildings up. This baby is trying to emulate it's mother and make it a damn pain in the ass to demolish.

 

Be patient and encourage Pearls to rush not our larger CBD TOWERS

  • Like 4
Link to comment
Share on other sites

I think everyone is being a little critical of this building and I don't understand why.

It will be a nice new shape on the skyline probably from the southeast and south views.

No its not a supertall and it doesn't fill up the block to the sidewalks, but its interesting shape will be a nice fit for downtown and break up the monotony of boxes and rectangles. All buildings built downtown don't need to be supertalls or even 50 story building to have an impact. Look at the Pennzoil.

It's 13 stories taller than the building it replaced so that's a positive gain. hopefully they will come up with an engaging plaza that will work well in creating a nice public space.

  • Like 4
Link to comment
Share on other sites

What's amazing to me is how some projects, with three tower cranes in a small footprint no less, can only muster up one floor every couple of months, while other projects in Houston seem to rocket skyward overnight.

 

This is solely tied to the types of floors being poured.  The floors being poured now are garage floors, which are much slower due to ramps, slopes, etc.  Tower floors, which are much simpler, take 5-7 days per floor.

  • Like 3
Link to comment
Share on other sites

I think the view from one or two angles ten miles away is a crappy way of judging a building. For me it is the look and feel up close.

Pennzoil is also a bad example to use to boost this building. For one Pennzoil is a master piece. It has a large footprint relative to the lot and its worth is judged on it own merits not how it looks among a cluster of building miles away. In my opinion, Pennzoil isn't particularly attractive once you get done distance away from it, and the only thing it adds to the skyline is filler. Up close though...

Link to comment
Share on other sites

From the same vendor I mentioned in the skyhouse thread he said this was supposed to be the site of the 100-story tower. Go ahead and laugh. Just passing the "rumor" on. Who knows...

Well, we got a tower here so he was %25 right lol

  • Like 1
Link to comment
Share on other sites

  • 3 weeks later...
  • The title was changed to Office Tower In Downtown At 1111 Travis St.

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
×
×
  • Create New...