Soil sample crews are back on site again. Interestingly, the Midway signs have been taken down.

Pretty sure Midway sold that site some time back. 

  • Like 2

Share this post


Link to post
Share on other sites
21 minutes ago, HOUTEX said:

Pretty sure Midway sold that site some time back. 

 

Their signs had been up at the site the last time I was over there about a month ago and had just been put up within the two years or so. 

 

My understanding is that they were trying to hold onto this lot to attract something like a grocery store or an anchor type building for the East End. Unless they sold to Marquette it would surprise me to find that they let this go to another developer. 

  • Like 4

Share this post


Link to post
Share on other sites

Yeah, the signs literally went down the day I posted that. I live by the lot and see it daily.

  • Like 2

Share this post


Link to post
Share on other sites

Its, Interesting that the property fronting Clinton, is continues to be excluded from the phased development.  Midway has loosely indicated that town-home, or single family residential was likely, I wonder if this is still the case. 

 

  • Like 3

Share this post


Link to post
Share on other sites
1 hour ago, Efkelly25 said:

What does this mean?

 

BGE is an engineering firm. They are currently working on storm and sewer infrastructure on site, particularly at the Bayou. My guess is someone decided to have a little fun with the application.

  • Like 2

Share this post


Link to post
Share on other sites

The work that is going on the site. Is that for East River or the Buffalo Bayou. I haven’t seen much activity there in awhile? 

  • Like 1

Share this post


Link to post
Share on other sites
Posted (edited)

There hasn’t been rain. Low flow settles and clears up the water.  

Edited by Naviguessor
  • Like 8

Share this post


Link to post
Share on other sites
17 hours ago, HoustonMidtown said:

50014160696_c202a59b19_k.jpgUntitled by Houston Midtown, on Flickr

 

 

although this looks great and is very nice.  it won't be long until mother nature reclaims that part of the trail to herself.  this bayou, like most in Texas meanders on it's own and changes with each big flooding cycle.  It would be nice for them to put our bike trails much higher or further away from the water's edge so that all that incredible work wouldn't go to waste with a constant barrage of 500 year and 1000 year floods that seem to keep happening at an increased rate.  for some reason, mankind, and especially the agency controlling this waterway within Houston, always seems to think we can wrestle, reign in, and generally control our natural habitats and waterways without regard to future consequences.  It is a complicated ecosystem and would serve all of us well to better understand what mother nature has taken hundreds of thousands of years to put in place, for our enjoyment and use.  Yes, if we could only get rid of stuff like concrete lining of the bayou, cutting off sharp turns whenever it suits us, throwing rip rap on the sides to "shore it up" all the time knowing because of past events that all these things do after a number of years is worsen flooding and bank erosion.  I know for sure there is a way to put the bike trails safely at a certain sustainable distance and/or elevation so that we aren't having to tear down and recreate the trails after every big flood event in Houston and Harris County.  But then again, I don't believe working with nature is one of this agency's priorities in the least.  If it were, we wouldn't have bad decision after bad decision create worse flooding and the need for more and more money to "fix" the problems over the long run.

But I digest...

 

  • Like 2

Share this post


Link to post
Share on other sites

ArtNsf - The sheet piles will prevent the erosion of the bank...that is what they are designed to do.   BBP knows this and they are the ones designing the waterfront.  When they surveyed what residents wanted from the Easter Sector landscaped a big response was the ability to get close to the water, including entry points and water taxi landings.  That is what you are seeing here, as the sheet piles taper down towards water level.  Certainly, during floods, this "hard" edge will become inundated and the water's edge will ascend the slope behind the bulkhead.  But, the bank will is not likely to fail.  Certainly, there will be silting and clean-up will be required...but this isn't terribly difficult.  The Partnership has learned a lot of lessons from Harvey and generally knows what they are doing.  The hard-bank/bulkhead, which is being installed, is necessary to prevent erosion, but IMO, it is good to see that it wont just be a 30ft wall all along edge of the East River property.  It'll make it far more enjoyable to use and enjoy, even if it has to be closed and cleaned from time to time.   

  • Like 6
  • Thanks 2

Share this post


Link to post
Share on other sites

I haven't seen any pictures of this side of Downtown. I'm told by local businesses and residents the area did well during Harvey. It's unlikely Midway would be putting so much bank on the side of the bayou without doing their homework on flooding/erosion.

 

Also, at a certain point past Downtown, tides and wind control the water levels, not rainfall.

  • Like 2

Share this post


Link to post
Share on other sites

downstream of downtown is pretty safe from flooding. 

 

all the buildup around the bayou in downtown creates a dam of sorts within the channel only a specific volume of water can get through per unit of time. if the volume of water entering the bayou upriver is greater than that then it backs up and fills up the channel. eventually overtopping the 'banks' and starts going through the streets/buildings.

 

it isn't until after the confluence of the WOB and buffalo that the channel opens up.

 

I'm certainly not a hydrologist, but through observation of how Harvey and previous floods worked their way through the bayou system you can see that there is a severe blockage somewhere in downtown.  I had a really great vantage point to watch from my office that occupied one of the entire upper floors of Chase tower.

  • Like 5
  • Thanks 1

Share this post


Link to post
Share on other sites
Posted (edited)
On 6/18/2020 at 12:55 PM, samagon said:

I'm certainly not a hydrologist, but through observation of how Harvey and previous floods worked their way through the bayou system you can see that there is a severe blockage somewhere in downtown.  I had a really great vantage point to watch from my office that occupied one of the entire upper floors of Chase tower.

 

Right, isn't that do to the many DT bayou bends that are soon to be turned into the (presently funded, but in que with i45 build-outs) north canal? No hydrologist either but if that sharp bend always caused flooding and backups in and around that part of down town what does it mean for east river area when the kink in the hose is released? Other than the phase five bend most looks pretty straight so I'd hope nothing much would change.

Edited by Two
  • Like 3

Share this post


Link to post
Share on other sites
Posted (edited)

Feels like in the time they've worked on the bayou 2404 Navigation has almost been entirely built. Any reason this is lagging so hard?

Edited by ljchou
  • Like 1

Share this post


Link to post
Share on other sites
59 minutes ago, ljchou said:

Feels like in the time they've worked on the bayou 2404 Navigation has almost been entirely built. Any reason this is lagging so hard?

 

I would imagine it is because 2404 Navigation isn't relying on dozens of companies to commit to leases during the biggest health crisis since the 80s. 

  • Like 4

Share this post


Link to post
Share on other sites

Not to mention the fact that 2404 is one small lot while East River is a massive development that needs utilities, roads, and all that jazz run before you can even start.

  • Like 6

Share this post


Link to post
Share on other sites
24 minutes ago, JBTX said:

Not to mention the fact that 2404 is one small lot while East River is a massive development that needs utilities, roads, and all that jazz run before you can even start.


I think people forget this. They are literally building a (very) small city from scratch for East River.

  • Like 4

Share this post


Link to post
Share on other sites
20 hours ago, thedistrict84 said:


I think people forget this. They are literally building a (very) small city from scratch for East River.

It just feels like we'd see more of this "small town" development happening other than just waterfront reinforcement. The pending lease commitments make sense.

Edited by ljchou
  • Like 3

Share this post


Link to post
Share on other sites
1 hour ago, hindesky said:

Rode around the whole perimeter of the project and the only thing being done is the shoreline work.

NvjyGeN.jpg

Has most of the utility work been done? 

Share this post


Link to post
Share on other sites
6 minutes ago, j_cuevas713 said:

Has most of the utility work been done? 

 

I haven't seen a ton of activity over there, although I'm mostly working from home now and rarely leave, so I don't drive by nearly as often as I did pre shutdown. 

  • Like 2

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...

×
×
  • Create New...