As a PVA grad, I really hope that HISD can afford to build a quality project that will accomodate the classroom, rehearsal, lab, perfomance spaces plus parking, all within a 62,500 sqft footprint, without skimping. It is going to cost so much more to go vertical. Please, please, please give HSPVA the quality campus this amazing school deserves.

Link to comment
Share on other sites

  • 2 weeks later...
  • 3 months later...

Sorry if this has been posted somewhere else.

I attended the Neartown Montrose Community meeting this morning on HISD bond proposals and heard Ronnie Veselka (HISD) speak. He wanted us to know that all the proposals of building and renovating would be finished by 2020. He said 1300 Capitol street will be the new location of HSPVA campus because of it's location to performing arts venues. Really?!?

Plus after several questions over what would become of the building on Stanford where the HSPVA is now--answer-No one at HISD has any idea what will become of this building.

There is a huge sign outside of HSPVA that speaks to the remodeling being down right now.

Peter Brown spoke against the 1300 Capitol location and said land along the Washington corridor had been offered--even proposed/ donated to keep HSPVA being located on Capitol street.

What's going on?

Link to comment
Share on other sites

ost='411633']

What's wrong with putting it on Capitol?

At the meeting problems with Parking, Traffic& Public Transportation were brought up. Then a huge discussion about elevators and high School students as well as what a schlep it was to the other performing venues---plus a long discussion about why the HSPVA is being moved when millions are being spent right now on the current building.

I have to admit I find it hard to believe no one at HISD has any idea what will happen to current building on Stanford.

Edited by trymahjong
Link to comment
Share on other sites

eh, 1300 Capitol makes perfect sense. It's 5 blocks from Jones Hall. That's less than a 10 minute walk. Students are carrying heavy equipment? Their campus would be directly on the light rail line.

Yes, parking could be an issue, assuming that this one block is all that HISD owns. There are two blocks caddy-corner to this site that are currently completely vacant- perfect locations for parking garages and close enough to connect with skyways.

Would a location actually *in* the theater district be more convenient? Maybe, except that there are also venues on the east side of downtown now. This site is within easy walking distance of the Theater District, HOB, Discovery Green, the Convention Center etc.

Link to comment
Share on other sites

Veselka said it would cost $700 per square foot for this project-----it that the going price? The total cost of these bonds makes my head spin.

Really though I'm not sure the part that really rubs me the wrong way is abandoning the current location after meeting with the local residents and assuring them that

that property was being improved to help with the overall improvement of that neighborhood.

Link to comment
Share on other sites

Veselka said it would cost $700 per square foot for this project-----it that the going price? The total cost of these bonds makes my head spin.

Really though I'm not sure the part that really rubs me the wrong way is abandoning the current location after meeting with the local residents and assuring them that

that property was being improved to help with the overall improvement of that neighborhood.

The neighborhood has been well aware for a very long time that HSVPA would be leaving. It has only been a question of when funds would become available to build a new facility.

Edited by Houston19514
Link to comment
Share on other sites

At the meeting problems with Parking, Traffic& Public Transportation were brought up. Then a huge discussion about elevators and high School students as well as what a schlep it was to the other performing venues---plus a long discussion about why the HSPVA is being moved when millions are being spent right now on the current building.

I have to admit I find it hard to believe no one at HISD has any idea what will happen to current building on Stanford.

It sounds like you misunderstod most of the discussion. Most of the issues you are presenting are issues with the current HSVPA facility/location (possibly excepting the elevator "issue" and that hardly seems an issue in that any multi-level high school is going to have to have elevators.)

Link to comment
Share on other sites

  • 2 weeks later...

looks like this is official

http://blog.chron.co...nent-locations/

"HISD officials have said HSPVA will move downtown. The new school is planned for the 1300 block of Capitol near Discovery Green and Minute Maid Park. The district-owned site is now being used for parking.

Grier said the school could be be built atop a parking structure on the site."

Edited by DrLan34
Link to comment
Share on other sites

looks like this is official

http://blog.chron.co...nent-locations/

"HISD officials have said HSPVA will move downtown. The new school is planned for the 1300 block of Capitol near Discovery Green and Minute Maid Park. The district-owned site is now being used for parking.

Grier said the school could be be built atop a parking structure on the site."

I believe Grier was talking about DeBakey being built atop a parking structure. Your quote makes its seem as if you are talking about HSPVA.

Link to comment
Share on other sites

I believe Grier was talking about DeBakey being built atop a parking structure. Your quote makes its seem as if you are talking about HSPVA.

True, I thought it was for HSPVA, it is not.

looks like this is official

http://blog.chron.co...nent-locations/

"HISD officials have said HSPVA will move downtown. The new school is planned for the 1300 block of Capitol near Discovery Green and Minute Maid Park. The district-owned site is now being used for parking.

Grier said the school could be be built atop a parking structure on the site."

Parking structure would be for DeBakey, not HSPVA.

Link to comment
Share on other sites

The next big question, what will become of the old school?

A couple of mid rise apartments? Major mixed-use or maybe a park?

I believe HISD is doing some remodeling to the HSPVA building. They may retain the property and use it for other purposes. Maybe for administration purposes or possibly a new school. If not most likely a mid rise apartment building.

Link to comment
Share on other sites

  • 4 weeks later...

I'm curious why this project is being considered as JUST a high school or just an office tower. Someone posted a pic of 8 Spruce St. in NYC by F. Gehry; it's not just condo's and offices but has an elementary school at it's base. Considering the amount of public transportation at the Capital St. site it wouldn't be too hard to get a parking variance.

Edited by infinite_jim
Link to comment
Share on other sites

  • 1 month later...

It would be cool if they did something like a public-private partnership and had residential on top of school. Would be a great use of space next to all the other (mainly residential) development going on nearby. It would allow for some of the construction costs to be lifted off of HISD and create a nice residential area in a pretty central location in downtown.  

Link to comment
Share on other sites

  • 2 months later...
  • 2 months later...
  • 3 weeks later...
  • 2 months later...

“For the new building, transparency will be very important,” said HSPVA student and violinist Gabriel Maffuz. “It’ll make you feel like you’re truly in an artistic environment.”

 

HSPVA Principal Scott Allen wants the new school to create a culture of inspiration. “We don’t want to have arts on one floor of the school and academics on another. It needs to be integrated,” he said.

 

http://blogs.houstonisd.org/news/2013/10/09/workshops-guide-designs-for-new-hspva-and-debakey-campuses/

 

Link to comment
Share on other sites

Ah yes.  Why select a prestigious architect when there are such wonderful design firms like HOK, Gensler, PSP and others available?  The Houston way... it seems.

 

Would have been better to hold an open competition than to just select Gensler.  Though I know the reason Gensler was picked.  The architect who designed the current HSPVA works there.  He's a big shmoozer with the well-to-do-cocktail-crowd (very good at it I might add - which isn't an insult), and probably put the bug in someone's ear that they would be a more reasonable firm to select than Diller Scofidio+Renfro (or others).

Link to comment
Share on other sites

That building was designed when Marshall Strabala was design director there.  He left to form his own firm in Shanghai some time ago.  He came to them from SOM where he was one of their top designers.

 

The center for dance is nice - and Gensler does nice work, but I don't think of international design firm when I think of them.

Edited by arche_757
Link to comment
Share on other sites

  • 2 months later...
  • 2 weeks later...
  • 2 weeks later...
  • 2 months later...

Before anyone gets on my case for criticism of a building on what is now a surface lot, let me say that it is fantastic that a school is returning to the block that held the original Houston high school.  It is also great to see diversity of use returning to downtown.  

 

All that said, I don't much like the design.  It just seems like random bits thrown together with no cohesion.  The overhang over the drive-in is top-heavy, and the giant HSPVA letters are just god-awful.  I hated the jumbo lettering at the Beck addition to MFAH, and this is even more egregious.  Shame, because I always thought the Montrose building was really well done.

 

 

  • Like 2
Link to comment
Share on other sites

^I've always been underwhelmed by the Montrose school building.  I think if it were in an empty (recently clear-cut) field most would probably see the bad architecture for what it is.

 

This is very underwhelming.  The YMCA is better architecture.  I don't hate this, or find it terrible (far from it) but I do think its far less than what we were lead to believe the sum of its parts would end up being.  Good for them moving closer into town and closer to the arts scene.  I'm guessing the old site will eventually be razed and new 5-6 level wood framed apartments over a concrete parking deck (or two) will replace the old school in Montrose?

Link to comment
Share on other sites

Nice geometric interplay, although beige brick reminds me too much of the 1970's era high schools I grew up around.

Exactly. This is going to look dated fairly quickly. The giant letters look cool but I wonder how much of a mess that will be when the pigeons discover those spots.

Link to comment
Share on other sites

trust me subdude, you have over (8+ thousand post).  thus, you have more than earned your right to add a bit of subtle critique to a prospective edifice that all have been anticipating.  not to mention...  you are hereby absolutely correct!

 

Before anyone gets on my case for criticism of a building on what is now a surface lot, let me say that it is fantastic that a school is returning to the block that held the original Houston high school.  It is also great to see diversity of use returning to downtown.  

 

All that said, I don't much like the design.  It just seems like random bits thrown together with no cohesion.  The overhang over the drive-in is top-heavy, and the giant HSPVA letters are just god-awful.  I hated the jumbo lettering at the Beck addition to MFAH, and this is even more egregious.  Shame, because I always thought the Montrose building was really well done.

 


Link to comment
Share on other sites

urbannizer, you are the consummate "gem" as per keeping us members up to date with the "going up" status quo.  that being said...  i must admit that this particular much anticipated HSPVA edifice, reminds me of a modern day "nabisco plant"!

 

suddenly, i feel as though i'm craving "ritz crackers".  i shall continue to monitor this illustration throughout the evening in hopes that my hunger shall subside.

 

 


  • Like 1
Link to comment
Share on other sites

  • Highrise Tower changed the title to HSPVA's Downtown Campus Renovations

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...