Jump to content

Brazos Towers At Bayou Manor: Assisted Living At 4141 S. Braeswood Blvd.


lockmat

Recommended Posts

The 48-year-old Bayou Manor assisted-living facility is building a new 14-story tower to offer more long-term health care services to its residents.

The $67 million tower, to be built at 4141 S. Braeswood Blvd., near the Texas Medical Center will include 84 apartments, under-building parking with elevator access to residences and 32 assisted-living and memory-support residences.

In addition, the tower will feature a pool and fitness amenities, dining venues and a 180-seat event center.

Brazos-Tower-rendering*280.gif?v=1

http://www.bizjourna...ed-for-med.html

Edited by lockmat
  • Like 1
Link to comment
Share on other sites

Interesting - another senior complex is going up at 4141 N. Braeswood:

http://www.houstonar...dge-apartments/

Good eye. Hopefully the one across the street will be as nice as this one. They did a good job designing it I think:

"what's new" > "on the boards" http://www.thw.com/index.html

Edited by lockmat
Link to comment
Share on other sites

  • 1 year later...

More retirement options.

 

IMG_0087.jpg

 

 

http://brazostowers.com/

 

 

The plan includes a 14-story high-rise with magnificent views of the Houston skyline, 84 new apartment residences, 32 spacious assisted living residences, state-of-the-art wellness and fitness amenities, exciting dining venues and a new 180-seat performance and event center.

 

Link to comment
Share on other sites

There was a retirement tower planned in this area a few years back. It had a video too but different from this one. Is this the same location?

Found it. It is the same one http://www.houstonarchitecture.com/haif/topic/25205-assisted-living-tower-planned-for-med-center-area/?fromsearch=1

Edited by lockmat
Link to comment
Share on other sites

  • 2 months later...
  • 5 months later...
  • 1 month later...
  • 3 weeks later...
  • 2 months later...

Construction is well underway by now. A crane was constructed this morning and there were at least 8 cement trucks on the site about a week ago.

Also, I think we should move this thread to Going Up especially that it's not actualy in (or near) the Med Center.

  • Like 2
Link to comment
Share on other sites

Construction is well underway by now. A crane was constructed this morning and there were at least 8 cement trucks on the site about a week ago.

Also, I think we should move this thread to Going Up especially that it's not actualy in (or near) the Med Center.

 

oh? been waiting on the crane!

Edited by LarryDierker
  • Like 1
Link to comment
Share on other sites

  • 1 month later...
  • 3 weeks later...
  • 1 month later...
  • 3 weeks later...
  • 3 weeks later...
  • 3 weeks later...
  • 4 weeks later...
  • 2 weeks later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...