Search the Community
Showing results for tags 'kirksey architecture'.
-
Fom The Houston Chronice CONSTRUCTION Hermann ready to start building After winning tax breaks from the city of Houston and Harris County, Memorial Hermann Healthcare System will break ground this month on a long-awaited medical center and office building. The 30-story tower, which will include more than 500,000 square feet of space, will be built at the corner of Fannin and MacGregor in the Texas Medical Center. Mischer Healthcare Services is a partner in development of the building, Memorial Hermann Medical Plaza. The $155 million facility will include an ambulatory care center, an imaging center and surgical and endoscopy suites. Holliday Fenoglio Fowler arranged a $117.5 million construction and permanent loan for the project through Teachers Insurance Annuity Association and GMAC Commercial Mortgage Bank.
- 111 replies
-
- 1
-
- university of texass
- kirksey architecture
- (and 5 more)
-
A multifamily building is proposed for the River Oaks area at the corner of Mimosa & Revere. SubdivisionPlatPDF_1031-14.pdf
- 152 replies
-
- 3
-
- mirador group
- pelican builders
- (and 5 more)
-
New building in Clear Lake for KS. The address is 18833 Gulf Freeway in Webster. Designed by Kirksey Architecture.
- 2 replies
-
- 1
-
- clear lake
- kelsey seybold
-
(and 2 more)
Tagged with:
-
Shell Technology Center Houston At 3333 Highway 6 S.
hindesky posted a topic in Katy and Points West
Architect - https://aecom.com -
HCC Brays Oaks Campus located at 8855 W Bellfort Blvd. Nice looking building designed by Kirksey Architecture. https://www.hccs.edu/locations/southwest-college/brays-oaks-campus/ https://www.kirksey.com/portfolio/projects/houston-community-college-brays-oaks-new-campus-workforce-building
-
- college
- houston community college
-
(and 1 more)
Tagged with:
-
I wonder when this corner will be redeveloped into something taller. A High-Rise hotel just opened next door. Levit-Green is just a mile down Holcombe. Prime real estate to just have a single-story building.
-
- 1
-
- amelang partners
- collum commercial
- (and 3 more)
-
Architect - https://www.kirksey.com
-
- yes prep
- kirksey architecture
-
(and 1 more)
Tagged with:
-
Not much really, but there is a crane. http://www.kelsey-seybold.com/newsroom/pages/main-campus-undergoes-expansion-to-enhance-cancer-care-and-collaboration.aspx#.U4vSdyi9Zaw http://www.bizjournals.com/houston/morning_call/2014/03/kelsey-seybold-clinic-to-expand-main-campus-to.html IMAG0028 by Not.Larry.Dierker, on Flickr IMAG0027 by Not.Larry.Dierker, on Flickr
- 2 replies
-
- 2
-
- kirksey architecture
- st. lukes
- (and 3 more)
-
New building for this church campus at 6400 Woodway Dr.
- 1 reply
-
- 1
-
- kirksey architecture
- tanglewood
-
(and 2 more)
Tagged with:
-
Houston Country Club sure does have a lot of permitted work. I see permits for 1 Potomac Dr. almost daily. https://www.houstoncc.com/
-
- 1
-
- kirksey architecture
- houston country club
- (and 5 more)
-
We didn't have a thread for this campus and building. Within time the surface lot will developed. The building's address is 1977 Butler Blvd.
-
- 1
-
- texas medical center
- baylor
-
(and 1 more)
Tagged with:
-
http://www.trinity.edu/mkearl/death02/deat...e/01Define.html is likely to get a "modern" neighbor. The site is on Memorial Woods Drive, 77024, facing the Katy Freeway directly west and south of its interchange with 610. Kirksey has designed a 16-storey speculative office building and 1,500-space parking garage on what is currently First Baptist Houston's west lot. First Baptist's homepage suggests, "Parking off-site is one of the easiest ways that HFBC members can support the church's ministry. Doing so opens up on-site spaces for visitors, families with young children and individuals with physical limitations. Refer to the online map for available parking options, shuttle routes, and drop-off/pick-up locations." From the day we moved to this location (April 17, 1977), finding room for parking has been a challenge. In fact, the first published "master plan" for this site specified a parking garage on the west parking lot. Since that time, financial constraints and questions concerning feasibility have thwarted at least three attempts to construct a parking garage. This opportunity is the first that brings no additional financial obligation to HFBC and actually returns funds to HFBC in the form of lease payments to the church and the elimination to the church of parking leases and shuttle fees. In April of 2007, representatives of the Gerald Hines Company met with Pastor Gregg and several Deacons to explore the possibility of commercial development on our west parking lot which would include a parking garage containing about 1500 spaces. Following the meeting, Hines paid for a feasibility study including traffic, engineering and architectural issues. In a presentation to the Deacons in August of 2007, Hines asked for a vote of approval to investigate the economic viability of such a project. Now, in January of 2008, they are asking for a congregational vote ensuring the "surety of the proposal." In other words, if Hines can locate the tenants, Trustees of HFBC have the authority to enter into a ground lease. Garage construction would begin no earlier than January 2009 and take approximately 1 year to complete, while the office tower will begin upon 40% pre-leasing. Fun-to-learn-from bunches of renderings, site plans, floorplans and graphical timeline in http://www.houstonsfirst.org/pdf/hines.pdf , so I won't merely post the pictures. Latest design & info as 9/2015: http://www.houstonchronicle.com/business/real-estate/article/First-Baptist-owned-land-to-get-office-tower-6504225.php
- 65 replies
-
- 1
-
- kirksey architecture
- katy fwy
- (and 4 more)
-
http://www.bizjournals.com/houston/blog/breaking-ground/2013/06/exclusive-even-more-luxury-living-for.html Inter-Pier LLC’s plans for the structure, to be named Belfiore and located on Post Oak Lane, between San Felipe and Woodway, show it will stand 26 stories with only two homes per floor, totaling 44 residences and two penthouses. actually got the (late) scoop on this Monday - supposedly several units are already presold. corner of s. post oak and wynden, right down the street from the old masaraf's. man, is the galleria area booming right now or what? there's several other high rise projects in the works scattered all about uptown/galleria. i bet the tanglewood nimby's are fuming right now! /sarcasm
- 143 replies
-
- 5
-
- kirksey architecture
- uptown
- (and 3 more)
-
The people at the Downtown YMCA told me that they have bought a lot a couple of blocks away and will move locations in the next couple of years. It will be nice to have a newer, updated YMCA, but I wonder what will happen to the old building?
- 119 replies