Jump to content

uhlaw09

Full Member
  • Posts

    164
  • Joined

  • Last visited

  • Days Won

    4

Everything posted by uhlaw09

  1. EDIT: Already covered above. However, still very excited about this. Will be interesting to see what this "Phase Two" will look like, given the comments in the articles below. http://www.marketwatch.com/story/gid-development-announces-dynamic-phase-two-of-regent-square-development-2013-02-14 http://www.chron.com/business/article/New-cinemas-in-Houston-give-luxury-a-starring-role-4276779.php?t=863144c6ed
  2. It will be interesting to see the extent to which that development ties into the prior Regent Square plans (if at all).
  3. By the way, as someone who works a couple of blocks away and has watched the progress of this construction on a daily basis.... MainPlace really turned out to be an awesome building. The skin, curvature, reflections, etc. are stunning. Among the buildings Houston has built in recent memory -- this one truly is a gem. You guys should come check out the (near)-finished product from ground level if you haven't had the opportunity yet.
  4. Dozers are on site doing dirtwork -- things are under way. But honestly... it's just a car wash.
  5. I've noticed this too, but I wouldn't read much into it. They've been doing pretty minor work on the site sporadically for the past couple of years, yet it still looks virtually the same as it did in 2007. They've also marked the Dunlavy / W. Dallas sidewalks for ramps and improvements at the intersection. My guess, however, is that the original "stimulus" deal with the tax rebate is dead. It required infrastructural improvements to begin by October 2009 and private development to begin by October 2010 (as reported by Chron). Latest word (cited above) is that private development may start in 2012 (http://culturemap.com/newsdetail/08-09-10-montrose-fields-forever-theres-a-billion-dollar-regent-square-project-among-those-weeds/). I may be misinterpreting what the original deal was, but I wouldn't think that a 2012 (or later) development was what everyone had in mind when the City was trying to "stimulate" its way out of the bottom of the recession in early 2009.
  6. Aqua Car Wash. Sign went up on the lot fairly recently, I believe. Also discussed here: http://swamplot.com/swamplot-street-sleuths-parking-lot-special/2010-08-17/
  7. I'm very pleased with the change in both name and design. This bridge is going to be a huge benefit to the area.
  8. Yeah, I'll verify this too. The rumor somewhere on here was that the LED on Wells Fargo was damaged by Ike, and the small LED piece that came on was probably malfunctioning due to the damage. I have noticed recently, however, that the same small LED piece has been cycling through different colors. I never saw it cycle through colors when the entire top of WF was lit.
  9. Yeah, and it looks like part will not rise past the 2nd or 3rd floor:
  10. This is a drive-by HAIFing showing the fast progress being made on the top structure. Taken Friday, November 6th:
  11. According to Emporis.com: MainPlace will be: 630 feet 1 Houston Center is: 680 feet (black box on right of photo) 2 Houston Center is: 580 feet (black box in the right-center that is mostly blocked by the white building with indentations [First City Tower]) So, according to info on Emporis, it should be exactly in between the height of 1 and 2 Houston Center. For reference, MainPlace is 1 block North and 1 block West of 2 Houston Center. This rendering provides some context: http://mainplacehous...20and%20WF.html All of this is to say that yes, I think you should have a pretty good view.
  12. Article here: http://politicalblog.abc13.com/2009/09/big-changes-coming-to-market-square.html
  13. Concrete pour is going on as I type, at 2AM on Friday night. I happened to drive by the site on the way home tonight and noticed the armada of cement trucks. I snapped some pictures as I drove by, but the construction cam provides the best view:
  14. Agreed regarding the infrastructure work. To get the City's stimulus money, they have to start infrastructural work by October 1, 2009, but they don't have to start the private development until October 1, 2010. So I wouldn't expect the actual development to begin until mid-2010 unless conditions change. I'm just glad to finally see activity on these huge lots that have been empty and untouched for the past 2 years.
  15. There is activity on both blocks of the Regent Square site today. There are 3 pieces of heavy equipment and about 10-15 workers on the site. The workers are surveying, spraypainting/flagging, and digging on the lots. Given that the developers are supposed to begin public improvements by October 1, it appears that the work began today. I'm optimistic that this is the first step toward the ultimate construction of Regent Square. Regardless, the Regent Square corridor (W. Dallas from Rochow to Tirrell) is seeing a lot of construction activity, shown below: Workers on the Regent Square lots: This building at the corner of W. Dallas and Rochow was demolished this morning. It was directly across the street from the developer's lot of trailers. The land is planned to be used as part of Phase 2 of Regent Square, so I don't know why it was demolished. Before: http://tinyurl.com/lqmv3g After: Also, this land is not related to Regent Square, but the neighboring office building at 3410 W. Dallas has been under renovation for a few months. It will serve as the new Norwegian Consulate, as confirmed by Swamplot: http://swamplot.com/...ian/2009-09-14/ Before: http://tinyurl.com/nb2658 Current:
  16. Picture from chron.com shows a good view of the progress from the grand balcony of OPP:
  17. Local media reports back in May/June indicated that their "stimulus" agreement with the city requires them to begin public infrastructural (utilities/streets) improvements by Oct. 1, 2009, and to begin private development by Oct. 1, 2010. My guess is that we'll begin to see some infrastructural work in a couple of months, and I would also guess that they would hold off on the private development as long as possible (depending on leasing). A similar process is going on nearby at the Fingers/Whole Foods lot at Waugh/W. Dallas. They began utility work 6+ months ago and are still working on new roadways and concrete work on the property. It doesn't appear, however, that they are in any hurry at all to begin to actually build out the development. If GID is going to comply with the guidelines proposed by the City, I would expect a similar timeline: begin infrastructural work in a few months, then maybe begin to build out the development in 12-15 months. This is lay opinion from tracking these developments in person and online.
  18. Today's daily demolition report on Swamplot includes the 4 condos on Clay St. that are fenced-off to be demolished for Regent Square construction. http://swamplot.com/daily-demolition-report-barry-alive/2009-07-09/#more-10423
  19. I can't imagine that UH has plans to force all Freshmen to live on campus in the future. I haven't deduced that from anything that I've read, and it makes very little sense that they would try to force people to live on campus. UH is--and has been for a long time--largely a commuter school. Furthermore, it's located in a terrible part of town, and the university hasn't been very successful in mitigating the effects of living in such an undesirable area. Thus, forcing all all freshmen to live on campus? Makes very little sense. But, building more dorms and greatly improving the "livability" and safety of campus? Makes a lot of sense. And that's how most universities (that I'm familiar with) do it. I would imagine that is UH's goal as well, but admittedly I do not know.
×
×
  • Create New...