sapo2367
Full Member-
Posts
306 -
Joined
-
Last visited
-
Days Won
2
Content Type
Profiles
Forums
Events
Everything posted by sapo2367
-
https://communityimpact.com/houston/heights-river-oaks-montrose/environment/2021/05/20/houston-oks-11-million-contract-for-north-canal-project-design/
-
https://communityimpact.com/houston/heights-river-oaks-montrose/transportation/2023/02/06/construction-starting-soon-on-washington-avenue-roundabout-road-resurfacing-planned-on-several-upper-kirby-streets/
-
Shell Building, Restaurant - 1808 N. Shepherd Dr.
sapo2367 replied to hindesky's topic in The Heights
Eh I'm skeptical its the bikeway that does them in -- their business looked slow no matter the number of lanes available. -
Keep putting that H‑E‑B energy out into the world y’all — we’ll manifest one in the east end eventually :)
- 2,034 replies
-
- 9
-
- multifamily
- east end
- (and 8 more)
-
- 1,093 replies
-
- 22
-
- kendall heaton associates
- michael hsus
-
(and 4 more)
Tagged with:
-
Memorial Park At 6501 Memorial Dr.
sapo2367 replied to themidtownguy's topic in Uptown and Galleria Area
I love the recurring circle motif they have, I think it is really well done :) -
- 1,093 replies
-
- 28
-
- kendall heaton associates
- michael hsus
-
(and 4 more)
Tagged with:
-
Saw the Cherry Demo equipment parked out in front over the weekend.
-
- 1,093 replies
-
- 25
-
- kendall heaton associates
- michael hsus
-
(and 4 more)
Tagged with:
-
Shepherd Dr. And Durham Dr. Reconstruction
sapo2367 replied to j_cuevas713's topic in Traffic and Transportation
https://www.shepherddurham.com/ they are posing weekly updates on the project status to this website -- nice to see the communication! Also, here is the TIRZ page on the project https://memorialheightstirz5.com/projects/shepherd-and-durham-major-investment-project/ -
I've biked it a few times now -- really great in terms of what it does for the bike network!! However the actual construction kinda sucks. The concrete segments are much more uneven than both the white oak and heights trails on either side. Its a pity they couldn't have at least matched the quality of the existing trail.
-
Riverhouse is posting on their social media that they are open as of today!
- 2,034 replies
-
- 1
-
- multifamily
- east end
- (and 8 more)
-
- 1,093 replies
-
- 22
-
- kendall heaton associates
- michael hsus
-
(and 4 more)
Tagged with:
-
Not exactly related to the current construction, but sounds like they will be rehabbing the old golf course in Inwood Forest to be retention ponds and will be adding trails https://houstonparksboard.org/inwood-recreation-project https://www.hcfcd.org/Activity/Active-Projects/White-Oak-Bayou/C-59-Inwood-Forest-Stormwater-Detention-Project
-
-
I-45 Rebuild (North Houston Highway Improvement Project)
sapo2367 replied to ToryGattis's topic in Traffic and Transportation
It was a long time ago now, but I remember attending a meeting where the city showed a proposal similar to this. The parts that were still up they also filled in underneath to have little shops etc, and the bits that were still elevated were enough that you could walk end to end. Definite High Line vibes- 3,339 replies
-
https://communityimpact.com/houston/heights-river-oaks-montrose/business/2022/09/22/a-2nd-cup-coffee-shop-to-relocate-from-heights-announces-second-location-coming-to-third-ward/ 2nd cup confirmed they are moving to Lindale Park, and opening a second location in the third ward
-
Houston Endowment Corporate Headquarters At 3683 Willia St.
sapo2367 replied to Urbannizer's topic in Going Up!
I was really disappointed when they did a bunch of work on the main drainage point in Spott's park (brand new concrete culvert and pipe it looked like), only for all the water to pool NEXT to the drain and cover up the path to the bayou.- 256 replies
-
- kevin daly architects
- kirksey architecture
- (and 3 more)
-
Thanks @hindesky!
- 48 replies
-
- downtown
- scarlet capital
-
(and 1 more)
Tagged with:
-
Yeah TBH I'm a little sad that I will still be able to see it haha. Meanwhile I definitely won't be able to see the astrodome anymore, which I was able to on a clear day before.
- 1,093 replies
-
- kendall heaton associates
- michael hsus
-
(and 4 more)
Tagged with:
-
There’s some work going on in the lot south of this building (digging up a portion of the parking lot). Not sure if these are related.
- 48 replies
-
- downtown
- scarlet capital
-
(and 1 more)
Tagged with:
-
- 1,093 replies
-
- 15
-
- kendall heaton associates
- michael hsus
-
(and 4 more)
Tagged with:
-
It’s part of phase 1, but the building hasn’t been announced. Some folks here have commented that it would be a good sized lot for a grocery store 😇
- 2,034 replies
-
- 2
-
- multifamily
- east end
- (and 8 more)