jermh
Full Member-
Posts
193 -
Joined
-
Last visited
-
Days Won
3
Content Type
Profiles
Forums
Events
Everything posted by jermh
-
Cloudy Sunrise Time-Lapse from Eleanor Tinsley Park
-
Brava: 46-Story Residential High-Rise At 414 Milam St.
jermh replied to brijonmang's topic in Going Up!
More Glass:- 1,067 replies
-
- 20
-
- multifamily
- hines
-
(and 2 more)
Tagged with:
-
This is from Sunday.
- 2,215 replies
-
- 34
-
- hines
- cesar pelli
-
(and 4 more)
Tagged with:
-
Brava: 46-Story Residential High-Rise At 414 Milam St.
jermh replied to brijonmang's topic in Going Up!
I forgot I took this one.- 1,067 replies
-
- 29
-
- multifamily
- hines
-
(and 2 more)
Tagged with:
-
This is a seriously cool expansion. I only made it up the first two floors, so I'll have to go back since I ran out of time. TIP: I found out the hard way if you wear a backpack, they will make you wear it on your front or carry it by the handle.
- 1,113 replies
-
- 15
-
- museum
- william ward watkin
- (and 5 more)
-
Brava: 46-Story Residential High-Rise At 414 Milam St.
jermh replied to brijonmang's topic in Going Up!
From Today:- 1,067 replies
-
- 19
-
- multifamily
- hines
-
(and 2 more)
Tagged with:
-
Brava: 46-Story Residential High-Rise At 414 Milam St.
jermh replied to brijonmang's topic in Going Up!
- 1,067 replies
-
- 14
-
- multifamily
- hines
-
(and 2 more)
Tagged with:
-
Snapped this the other day. Slightly wonky since I had to photomerge a multiple photos to get the entire building in the shot.
- 762 replies
-
- 31
-
- downtown
- multifamily
-
(and 4 more)
Tagged with:
-
Parkside Residences: 43-Story Residential High-Rise At 808 Crawford St.
jermh replied to largeTEXAS's topic in Downtown
The top rendering is old design concept. This has a rendering from inside the pool area.- 1,224 replies
-
- 5
-
- multifamily
- ziegler cooper
- (and 4 more)
-
TC Energy Center: Downtown Skyscraper At 700 Louisiana St.
jermh replied to houstonmacbro's topic in Downtown
Fly through video rendering of the interior renovations.- 81 replies
-
- 6
-
- retail
- mm properties
-
(and 6 more)
Tagged with:
-
Brava: 46-Story Residential High-Rise At 414 Milam St.
jermh replied to brijonmang's topic in Going Up!
Glass install progress.- 1,067 replies
-
- 16
-
- multifamily
- hines
-
(and 2 more)
Tagged with:
-
- 2,037 replies
-
- 12
-
- multifamily
- east end
- (and 8 more)
-
I may be overthinking this, but wouldn't this tenant make the rest of the building less desirable? "Hey, want to go grab drinks at, Gibbs' used to be a boat store -- now is next to cough, cold, and COVID testing site Bar & Grill?". I guess you're happy to get any retail tenant right now. If I were to speculate using purely judgmental Houston strip-center bingo, I'd say there's' a boutique dental practice and Poke restaurant coming next.
- 52 replies
-
- 1
-
- office
- oxberry groups
-
(and 3 more)
Tagged with:
-
WestMont: Mixed-Use Development Coming To Montrose
jermh replied to groovehouse's topic in Going Up!
Skanska recently purchased that strip center, so If they move forward with development it's probably going to have to move if it survives regardless of the rent cost. Here's a link to the thread about the development. -
Permits on the door:
-
Sorry to get yalls hopes up, but I was wrong. It's actually Mia Bella not a La Madeleine. I'll post a picture of the permit on the door below.
-
It looks like a La Madeleine is almost fully built out in the Rusk and Fannin corner of the building. Construction screening on the windows was removed, and when I walked by over the weekend I could see pallets of shrink-wrapped furniture ready to be unpacked.
-
Brava: 46-Story Residential High-Rise At 414 Milam St.
jermh replied to brijonmang's topic in Going Up!
Inquire about a leasing a unit. When I did a year or two ago the tour included the pool deck and gym on the 39th floor.- 1,067 replies
-
- 2
-
- multifamily
- hines
-
(and 2 more)
Tagged with:
-
Looks like they aren't planning on opening until downtown pedestrian traffic picks up.
-
TC Energy Center: Downtown Skyscraper At 700 Louisiana St.
jermh replied to houstonmacbro's topic in Downtown
Phase II of the lobby renovation is kicking off construction 8/31. Exterior windows punched similar to what was done for the restaurant space on the Capitol St side of the building. Additional conferencing, a coffee bar, and two floors of office space added in the former bank lobby.- 81 replies
-
- 6
-
- retail
- mm properties
-
(and 6 more)
Tagged with:
-
I wish we'd see a bike path in that corridor under the powerlines from Memorial Park to maybe Richmond.
- 602 replies
-
- 8
-
Hike And Bike Bridge Over White Oak Bayou Is Burning
jermh replied to s3mh's topic in Traffic and Transportation
That connection would be great because it gives you the option of avoiding that target parking lot and crossing houston avenue and all the intersections on spring street. That's whole stretch can be slow and sketchy and crossing at stude would bypass all of it. -
From the Magnolia Hotel rooftop.
- 2,215 replies
-
- 14
-
- hines
- cesar pelli
-
(and 4 more)
Tagged with:
-
Adjacent to the regular seated restaurant, it looks like common bond will also have some sort of counter service. Covered out-door seating area.
-
It looks like they are getting close to having the roof done. I walked by the building and the roll-up door on the front was open over the weekend, and the inside is about as far as you can be from being done.