-
Posts
315 -
Joined
-
Last visited
-
Days Won
4
Content Type
Profiles
Forums
Calendar
Everything posted by AREJAY
-
Stella & Braes: Mixed-Used Development By Barvin
AREJAY replied to Highrise Tower's topic in Going Up!
the giant pile of lumber still hasn't moved, but there's a new chain-link fence (demo fence?) around the existing buildings.- 26 replies
-
- 1
-
-
- stella link
- multifamily
-
(and 3 more)
Tagged with:
-
Good question. Stairway to heaven?
- 248 replies
-
- 3
-
-
-
- river oaks
- retail
-
(and 1 more)
Tagged with:
-
looking at the top floor 360 render, it looks like this will be right up there in height with one park place (518 ft), maybe a few feet shorter.
- 610 replies
-
- 1
-
-
- michael hsu
- downtown
-
(and 3 more)
Tagged with:
-
Still looks like a decent enough buildout after all the phases are complete
- 248 replies
-
- 15
-
-
This thing may not have arms anymore, but its got legs!
- 1244 replies
-
- 13
-
-
-
-
- streetlights residential
- rice village
- (and 3 more)
-
Uptown Oaks: Proposed 34-Story Senior Living High-Rise
AREJAY replied to SkylineView's topic in Going Up!
You beat me to it! Took the same pic a little before 4pm yesterday and was excited to post it this morning.- 60 replies
-
- 5
-
-
- highrise
- senior living
- (and 4 more)
-
Damn, that's so arrogant. I love it!
- 847 replies
-
- 14
-
-
-
- texas am university
- hotel
- (and 7 more)
-
There's something similar in place in Lajitas (about 2 hrs south of Marfa, and right at the entries to both BBNP and BBSP). But seems like it's mostly for the resort https://www.lajitasgolfresort.com/default.aspx?pg=airport
-
I think the 300K is to renovate one of the GFR spots inside this tower - Meaning the WF catty-corner at 2801 Kirby will likely not be around too much longer.
- 657 replies
-
- 7
-
-
-
- hanover company
- multifamily
- (and 4 more)
-
471 ft for the "IMP Building" and 268 ft for the student housing building https://oeaaa.faa.gov/oeaaa/external/searchAction.jsp?action=displayOECase&oeCaseID=446566214&row=288 https://oeaaa.faa.gov/oeaaa/external/searchAction.jsp?action=displayOECase&oeCaseID=446566207&row=287 Overview Study (ASN): 2020-ASW-10281-OE Prior Study: Status: Work In Progress Received Date: 07/26/2020 Entered Date: 07/26/2020 Map: View Map Construction Info Structure Summary Notice Of: CONSTR Duration: PERM (Months: 0 Days: 0) Work Schedule: 08/27/2020 to 06/01/2023 Structure Type: Building Structure Name: TAMU Health Plaza - IMP Building FCC Number: Structure Details Height and Elevation Latitude (NAD 83): 29° 42' 31.41" N Longitude (NAD 83): 95° 24' 10.58" W Datum: NAD 83 City: Houston State: TX Nearest County: Harris Proposed Site Elevation: 50 Structure Height: 471 Total Height (AMSL): 521 Frequencies Low Freq High Freq Unit ERP Unit Overview Study (ASN): 2020-ASW-10280-OE Prior Study: Status: Work In Progress Received Date: 07/26/2020 Entered Date: 07/26/2020 Map: View Map Construction Info Structure Summary Notice Of: CONSTR Duration: PERM (Months: 0 Days: 0) Work Schedule: 08/27/2020 to 07/01/2022 Structure Type: Building Structure Name: TAMU Health Plaza - Student Housing FCC Number: Structure Details Height and Elevation Latitude (NAD 83): 29° 42' 33.49" N Longitude (NAD 83): 95° 24' 09.85" W Datum: NAD 83 City: Houston State: TX Nearest County: Harris Proposed Site Elevation: 51 Structure Height: 268 Total Height (AMSL): 319 Frequencies Low Freq High Freq Unit ERP Unit
- 451 replies
-
- 17
-
-
- hta development
- office
- (and 6 more)
-
Looks like some new updates on Medistar's site: https://www.medistarcorp.com/in-development/
- 451 replies
-
- 13
-
-
- hta development
- office
- (and 6 more)
-
Saudi Arabia Oil Turn & The COVID-19 Pandemic
AREJAY replied to MidCenturyMoldy's topic in Off Topic
Oil is drastically down because of the price war between Saudi and Russia, not so much because of the virus. Fracking / shale can react quickly and be started and/or stopped quickly, while offshore / deepwater is super slow to react. I'm afraid that offshore activity is going to be depressed for a long while.... -
https://communityimpact.com/houston/bellaire-meyerland-west-university/development/2020/02/17/work-on-new-zoning-district-for-former-chevron-property-inches-forward/
- 86 replies
-
- 4
-
-
- retail
- kirksey architecture
- (and 6 more)
-
https://communityimpact.com/houston/bellaire-meyerland-west-university/development/2020/02/19/meyerland-apartment-community-nob-hill-is-for-sale/
- 2 replies
-
- 2
-
-
- multifamily
- meyerland
-
(and 1 more)
Tagged with:
-
And if the gateway station would ever get off the ground too. It shares the same block as the A&M development. I wonder if the A&M development will be a tipping point for the transit center . https://mcmunnnicholas.wixsite.com/nicholasmcmunnarch/copy-of-confidential-casino-and-res
- 451 replies
-
- 3
-
-
- hta development
- office
- (and 6 more)
-
ABC13 just had a blurb saying that A&M is releasing an announcement today at 11 about a development in Houston that would be “one of the largest in the country”.
- 451 replies
-
- 5
-
-
-
- hta development
- office
- (and 6 more)
-
Still there, still rotting away... Interesting video KPRC did about it: https://www.click2houston.com/news/investigates/2020/01/18/once-popular-houston-shopping-destination-now-riddled-with-violations/
-
Parkside Residences: 43-Story Residential High-Rise For Block 98
AREJAY replied to largeTEXAS's topic in Going Up!
Dang, you’re right. My bad guys! Triton is also right on the 42 story and block 42- 1147 replies
-
- 3
-
-
- trammel crow
- high street residential
-
(and 3 more)
Tagged with:
-
Parkside Residences: 43-Story Residential High-Rise For Block 98
AREJAY replied to largeTEXAS's topic in Going Up!
A structural permit was issued for this back at the end of September. It also lists it as 46 stories http://www.cohtora.houstontx.gov/ibi_apps/WFServlet.ibfs?IBIF_webapp=/ibi_apps&IBIC_server=EDASERVE&IBIWF_msgviewer=OFF&IBIAPP_app=soldpermits&IBIF_ex=sold_permit_d&CLICKED_ON=&PN=18099112&PT=13 Project Details Project No: 18099112 Date : 2019/09/26 00:00:00 USE : HIGH RISE SHELL & CORE FOR APTS 1-46-1-S Owner/Occupant : *BLOCK 42 OWNER LLC Job Address : 414 MILAM ST 77002 Valuation : $ 71,375,000 Permit Type : 13 FCC Group : Apartments Buyer : *BLOCK 42 OWNER LLC Address : 609 MAIN 4400 77002 Phone : (713) 237-5607- 1147 replies
-
- 9
-
-
- trammel crow
- high street residential
-
(and 3 more)
Tagged with:
-
Wow, this thing doubles in height every 6 months!! Can't wait to see the renders in 2020! https://bkvgroup.com/project/bristol-cove/ Completion in early 2021... They better get a move on!
- 35 replies
-
- 12
-
-
-
-
You know its bad when a mod jumps into it too.
- 486 replies
-
- 5
-
-
-
- texas am university
- university of texas
- (and 5 more)
-
6400 West Loop South: 9-Story Medical Office With Retail
AREJAY replied to Urbannizer's topic in Going Up!
Saw some surveying stakes and some markers around trees at this site this morning. And there's new renderings on the LoopNet listing:- 19 replies
-
- 16
-
-
- residential
- bellaire
-
(and 3 more)
Tagged with:
-
https://oeaaa.faa.gov/oeaaa/external/searchAction.jsp?action=displayOECase&oeCaseID=414970739&row=272 Looks like construction is starting on this one soon. (10/14/19), 130' height Overview Study (ASN): 2019-ASW-12662-OE Prior Study: Status: Work In Progress Received Date: 08/21/2019 Entered Date: 08/21/2019 Map: View Map Construction Info Structure Summary Notice Of: CONSTR Duration: TEMP (Months: 6 Days: 0) Work Schedule: 10/14/2019 to 05/05/2020 Structure Type: Crane Structure Name: HGI H2S Crane FCC Number: Structure Details Height and Elevation Latitude (NAD 83): 29° 42' 17.19" N Longitude (NAD 83): 95° 23' 08.30" W Datum: NAD 83 City: Houston State: TX Nearest County: Harris Proposed Site Elevation: 45 Structure Height: 200 Total Height (AMSL): 245 Frequencies Low Freq High Freq Unit ERP Unit https://oeaaa.faa.gov/oeaaa/external/searchAction.jsp?action=displayOECase&oeCaseID=414970249&row=282 Overview Study (ASN): 2019-ASW-12661-OE Prior Study: Status: Work In Progress Received Date: 08/21/2019 Entered Date: 08/21/2019 Map: View Map Construction Info Structure Summary Notice Of: CONSTR Duration: PERM (Months: 0 Days: 0) Work Schedule: 09/03/2019 to 09/03/2021 Structure Type: Building Structure Name: HGI H2S Building FCC Number: Structure Details Height and Elevation Latitude (NAD 83): 29° 42' 17.19" N Longitude (NAD 83): 95° 23' 08.30" W Datum: NAD 83 City: Houston State: TX Nearest County: Harris Proposed Site Elevation: 45 Structure Height: 130 Total Height (AMSL): 175 Frequencies Low Freq High Freq Unit ERP Unit
- 115 replies
-
- 8
-
-
- the mathis group
- hotel
-
(and 3 more)
Tagged with:
-
Bellaire NIMBYs are the worst
- 86 replies
-
- 7
-
-
- retail
- kirksey architecture
- (and 6 more)
-
I agree, "Prison Place" or "Jail Junction" would be more fitting.
- 258 replies
-
- 6
-
-
-
-
-
- warehouse
- urban genesis
-
(and 2 more)
Tagged with: