-
Posts
294 -
Joined
-
Last visited
-
Days Won
13
Content Type
Profiles
Forums
Events
Everything posted by Paco Jones
-
Modera Garden Oaks: Multifamily At 641 W. Crosstimbers Rd.
Paco Jones replied to Highrise Tower's topic in Going Up!
Architect: EDI International Information: 327 units (1BR-170, 2BR-157), total of 312,070 SF, 489 parking spaces- 35 replies
-
- 7
-
- the heights
- multifamily
-
(and 2 more)
Tagged with:
-
Address: 8730 W. Sam Houston Parkway Developer: Brinshore Development *Land shows to be owned by First Metropolitan Church on HCAD Architect: Pappageorge Haymes Partners Information: Mixed-income senior apartment building consisting of 157 dwelling units, surface parking lot with 152 parking spaces, interior amenity spaces, and exterior courtyard with spa and pool. 179,353 SF. The exterior will be stone masonry and stucco finish. Estimated cost is 34M.
-
Broadstone Beall: Multifamily At 925 W. 20th St.
Paco Jones replied to hindesky's topic in Going Up!
Also, directly north of this on W. 26th LMC (Lennar) has a nice mid-rise in development (will be at Johnny Steele property). This area is about to get very busy.- 64 replies
-
- 6
-
- broadstone
- the heights
- (and 3 more)
-
Broadstone Beall: Multifamily At 925 W. 20th St.
Paco Jones replied to hindesky's topic in Going Up!
This one is moving right along. I should have something to share next month (along with Broadstone EaDo).- 64 replies
-
- 4
-
- broadstone
- the heights
- (and 3 more)
-
Boulevard 61: Multifamily At 6101 Richmond Ave.
Paco Jones replied to Highrise Tower's topic in Going Up!
I can post the elevations and an overall site plan tomorrow. Just get ready for disappointment. About 80% hardi-siding, 15% stucco, and 5% brick (3-stories surrounded by parking). I too was hoping for something better, such as a mid-rise (at least).- 17 replies
-
- 5
-
- dma properties
- hha
-
(and 3 more)
Tagged with:
-
Boulevard 61: Multifamily At 6101 Richmond Ave.
Paco Jones replied to Highrise Tower's topic in Going Up!
This will be a 100-unit garden style apartment complex that will include affordable housing units. HEDK is the architect. Very much lacking in aesthetics, imo.- 17 replies
-
- 5
-
- dma properties
- hha
-
(and 3 more)
Tagged with:
-
Parkside Residences: 43-Story Residential High-Rise At 808 Crawford St.
Paco Jones replied to largeTEXAS's topic in Downtown
A couple of pictures from level 43 terrace deck.- 1,224 replies
-
- 23
-
- multifamily
- ziegler cooper
- (and 4 more)
-
Parkside Residences: 43-Story Residential High-Rise At 808 Crawford St.
Paco Jones replied to largeTEXAS's topic in Downtown
Yes. Level 35 was used as the drop point for the swingstages. These were used for installation of metal wall panels and other exterior wall scopes of work. It will now be framed, sheathed, and closed up and the swingstages will be dropped from level 43.- 1,224 replies
-
- 9
-
- multifamily
- ziegler cooper
- (and 4 more)
-
Project: Montrose Medical Office Building Address: 1732 Richmond Avenue Houston, Texas Architect: Kirksey Owner: Med-REIS, LLC Information: 13-story medical office building to be located on Richmond Avenue, across the street from The Fairmont Museum District. The project will be a podium type building with 5 levels of office space over 8 levels of above-grade parking. The 5th level of the building will be a conference/terrace level. The office levels will provide approximately 94,800 gross square feet. The parking garage contains approximately 299 parking spaces. Level 1 will be designed to accommodate an Urgent Care and an Medical Imaging tenant.
-
Second Baptist Church At 6400 Woodway Dr.
Paco Jones replied to Highrise Tower's topic in Holy Places
Project: Second Baptist Church - Children's Building Address: 6400 Woodway Dr. Architect: Kirksey Information: 4-story education building. Approx. 115,000 SF.- 1 reply
-
- 4
-
- kirksey architecture
- tanglewood
-
(and 2 more)
Tagged with:
-
Address: 1903 Yale Street Houston, TX 77008 Architect: Kirksey Information: 6-story mixed-use building. Two levels of lease space (approx. 90,000 SF) over three levels of parking. Ground floor consists of two retail areas, one being 8,200 SF and the other 12,100 SF. Construction start is anticipated for August 2022.
- 84 replies
-
- 23
-
- the heights
- kirksey architecture
-
(and 2 more)
Tagged with:
-
Uptown Oaks: Senior Living High-Rise At 4718 San Felipe St.
Paco Jones replied to SkylineView's topic in Going Up!
The Hallmark Project is a 488,000 SF, 34-story new construction high rise residential tower to be located at 4718 Hallmark Drive. There are 113 luxury independent living units on 25 residential levels over 5 levels of parking. There are amenity programs on ground level, level 2 and level 8. Levels 1 & 2 are connected to an existing 10-story apartment building. Site work includes modification of the existing Hallmark drop off, the addition of a new drop-off to be accessed from Garrettson Lane to the entry lobby of the new tower and landscaping for three courtyards and surrounding site. Construction anticipated to start June 2022.- 68 replies
-
- 28
-
- brazos presbyterian homes
- perkins eastman
- (and 3 more)
-
Generation Park: Mixed-Use In Northeast Harris County
Paco Jones replied to lockmat's topic in Going Up!
Project: Hope Media Group Ministry Center Owner: Hope Media Group Architect: Gensler Information: A new three (3) level office building of approximately 50,000 SF for Hope Media Group. Building use to be for radio broadcasting services and administrative offices. Parking for the office building will be off-site. The site ( North Redemption Square Road), is located immediately south and west of the intersection of West Lake Houston Parkway and Beltway 8/Sam Houston Parkway and bound on the west by Lockwood Road. The overall site improvements will be minimal, with a service entrance on the east side of the office building and small landscaping beds around the ground level of the building. The west-adjacent property will be developed into a pedestrian plaza (by others) and will serve the main the entrance to the new office building. The north-adjacent property, a Harris County drainage easement will be developed by McCord into a pedestrian park with landscape features including a pedestrian bridge.- 192 replies
-
- 2
-
- biotechnology
- gensler
- (and 6 more)
-
Parkside Residences: 43-Story Residential High-Rise At 808 Crawford St.
Paco Jones replied to largeTEXAS's topic in Downtown
It will be EIFS- 1,224 replies
-
- 4
-
- multifamily
- ziegler cooper
- (and 4 more)
-
Architect: Forge Craft Information: The project will consist of two buildings and a parking garage. Outdoor amenities include a swimming pool, play areas (covered and uncovered), gazebos, community gardens, and a dog park. Building #1 6-story with 168 units for a total of 184,420 SF. There are also two ground floor retail shell areas totaling 22,765 SF. Building #2 4-story with 157 units for a total of 134,864 SF. Garage 9-level precast concrete parking garage with a total of 558 parking spaces.
- 20 replies
-
- 11
-
- affordable housing
- greenspoint
-
(and 2 more)
Tagged with:
-
The Standard On The River: Multifamily At 91 Jensen Dr.
Paco Jones replied to hindesky's topic in Going Up!
This one is still a ways out. It will probably be around March before a general contractor is selected.- 115 replies
-
- 3
-
- architecture demarest
- multifamily
-
(and 2 more)
Tagged with:
-
The Woodlofts: Multifamily Mid-Rise In Shenandoah
Paco Jones replied to TowerSpotter's topic in Going Up!
Project name: The Woodlofts Address: David Memorial Drive and David J. Vetter Blvd. Owner/Developer: 5.2 Shenandoah, Ltd. a Joint Venture of Buckhead Investment Partners, Inc. and NorthGulf ZSP Architect: EDI Information: - 6-story parking garage with 4-story apartment wrap - Exterior finishes @ 80% masonry, 15% stucco, and 5% siding - 229 units @ 196,215 SF This project is out for construction pricing. Anticipated start of construction is January of 2022.- 2 replies
-
- 4
-
- shenandoah
- edi international
-
(and 1 more)
Tagged with:
-
Hilton Home2 Suites/TRU Hotel At 1540 Leeland St.
Paco Jones replied to Paco Jones's topic in Going Up!
This one is back out for budgetary construction pricing. Nothing has changed, same drawings as before.- 95 replies
-
- 10
-
- pa hospitality
- hotel
-
(and 3 more)
Tagged with:
-
UNITi Montrose: 9-Story Apartments At 701 Richmond Ave.
Paco Jones replied to CrockpotandGravel's topic in Going Up!
Looks like Avid Living is shopping this one around. There are two other GC's (that I am aware of) that are putting together budgetary construction pricing for the owner. A few changes: - 3-story parking with 6-story multifamily above - 238 units with 150,774 GSF (garage not included). - Two Ground Floor Retail areas, 1,810 SF and 2,220 SF - 85% stucco, 10% masonry, and 5% metal wall panel exterior Architect is still Meeks + Partners.- 228 replies
-
- 10
-
- montrose
- avid living 713
-
(and 2 more)
Tagged with:
-
Hilton Homewood Suites Hotel Houston Medical Center At 7755 South Main St.
Paco Jones replied to a topic in Going Up!
Project: Homewood Suites by Hilton - Houston Medical Center Address: 7755 Main Street Houston, TX 77030 Developer: HarDam Hotels & Housing Architect: MCS Architects, LLC Information: Levels 1 will consist of the hotel lobby, hotel bar, private dinning, and a small retail area. Levels 2-4 will be parking with levels 5-11 being hotel. Level 5 will have an outdoor terrace and pool deck. A total of 187 rooms and approximately 168,000 SF of occupied space. Braeswood Park Condominiums to be demolished.- 10 replies
-
- 17
-
- mcs architects
- hilton hotel
-
(and 2 more)
Tagged with:
-
Project name: Studewood Mixed Use Development Address: 1023 Studewood Houston, TX 77008 Owner/Developer: Yawning Interests, LLC Architect: Heights Ventures Information: 3-story 14,500 SF mixed-use building with roof terrace at level 3.
- 70 replies
-
- 17
-
- heights venture
- office
-
(and 4 more)
Tagged with:
-
Office With Retail - 3509 Harrisburg Blvd.
Paco Jones replied to Urbannizer's topic in EaDo, the East End, and East Houston
Architect: Gensler -
Sunset Boulevard Apartments At 1730 Sunset Blvd.
Paco Jones replied to Urbannizer's topic in Going Up!
This is by the same owner/developer as 1933 Dryden, Morningstar Development Ventures, LLC . I would expect something very similar to what they are building there.- 46 replies
-
- 7
-
- owl house properties
- multifamily
-
(and 1 more)
Tagged with:
-
It looks like the 9753 nine-story office building is slated to start back up the first of quarter 2022. Changes on the exterior, so permits were required.
- 117 replies
-
- 20
-
- office
- ziegler cooper
- (and 6 more)