Jump to content

Paco Jones

Full Member
  • Posts

    294
  • Joined

  • Last visited

  • Days Won

    13

Everything posted by Paco Jones

  1. Project: RO Parcel 3 Architect: House & Robertson (Exectutive) Michael Hsu (Design) Information: Two 3-story mixed-use buildings with a pedestrian bridge connecting them at level 2 outdoor terraces. Combined, the buildings total 129,622 SF. Levels 1 and 2 will consist of restaurant and retail space while level 3 will be office space.
  2. Architect: GDA Architects Information: 14-stories total. Levels 1-4 are parking and Levels 5-14 are residential (374,228 SF). 340 residential units with amenity/pool terrace on Level 5 and sky lounge at Level 14.
  3. Not necessarily financial troubles, just over budget on each of the three proposed developments. There will be a short delay while redesigns are made to bring them back within acceptable budget range. Who knows, maybe one of the projects gets shelved to provide the additional cap needed to proceed with the others...
  4. Address: 3120 Buffalo Speedway Architect: The Preston Partnership Information: Residential tower consisting of 28 levels above grade with one level of below grade basement. Parking is at basement and levels 1-5 and residential is levels 6-28. 317 units with a total of 378,387 SF of residential space. Ground floor retail space of 15,209 SF.
  5. Parcel H A 25-story Hotel and 18-story residential tower on top of a 4-story podium structure that includes a convention center and retail space. The roof terrace and pool deck is approximately 95,000 SF. The residential tower includes a rooftop pool deck that is +/-15,000 SF.
  6. Typically, this is just an elevated/raised pedestrian walkway. The term "dock high" is likely referring to the actual height the walkway will be, which would be around 4'. These help corral and distribute the pedestrian traffic. In this instance I could be completely wrong, though. For reference...
  7. Project: Hanover Buffalo Bayou Address: 707 Marston Architect: SCB (Solomon Cordwell Buenz) Information: A 317 unit residential tower consisting of 40 stories and two levels of basement parking. Pet Spa and outdoor Pet Run at Level 2. Outdoor amenity deck and swimming pool at Level 10. Project completion date of July 2025. Building Break Down: 2 Levels of Basement Parking Approximately 5,000 SF of ground level retail space Parking at Levels 1-9 Residential at Levels 10-40 484,777 SF Building 241,227 SF Garage (554 spaces)
  8. The permit was purchased by Lovett Commercial. I suppose they are teaming up with Fairfield on this one...?
  9. Project: Tanglewood Multifamily Owner/Developer: Palmetto Wynden LP (McNair Interests and Adelaide Real Estate) Architect: Kirksey Information: Mixed-Use project with office, multifamily residential, and structured parking podium components located on South Post Oak Lane at N. Wynden Rd. The building is a 17-story multifamily tower with an integrated shared podium garage structure (garage levels 1-4). The total gross building is approximately 439,500 square feet with 325,000 GSF of multifamily residential space (248 units) and a full complement of resident amenities. Also about 5,000 GSF of ground level commercial lease space. https://i.imgur.com/oKaen8U.jpg https://i.imgur.com/tW6D2tw.jpg https://i.imgur.com/nGBeyzD.jpg https://i.imgur.com/NAAl5B9.jpg https://i.imgur.com/MtJM59O.jpg https://i.imgur.com/gMBLGE3.jpg https://i.imgur.com/eyH7yrU.jpg https://i.imgur.com/IncNyWK.jpg https://i.imgur.com/ApBlhXP.jpg https://i.imgur.com/EeMhGIU.jpg https://i.imgur.com/eTfqoli.jpg https://i.imgur.com/E1hyRM8.jpg https://i.imgur.com/4CUqOgU.jpg
  10. A source informed me that, per BuildPro/Captiva, this development isn't happening (at least not by them).
  11. Until the liens are taken care of I wouldn't expect any work to continue. BTW, Google the owner of Highland Village...
  12. Project: Sully Architect: EDi Information: 5-story residential wrap around 6-level parking garage. 303 units for a total of 288,087 SF (excludes garage).
  13. Project: Residences on Westheimer Architect: Ziegler Cooper Information: 9 levels of residential over 4 levels of parking (1 level below grade). 209 units for a total of 359,551 SF of gross residential area. 2,800 SF of ground floor retail space. Construction will begin very soon.
  14. Project: The Langley Architect: EDi Information: 134 units with a total SF of approx. 388,000 (excluding garage). Construction to begin in February with a 32-month duration.
  15. Project: Alta Sunset Heights Architect: EDi Information: 5-story, 378 unit apartment building totaling 641,183 SF (excluding garage). Buildings wrap a 6-level parking garage.
  16. The above picture is of Alliance Residential's Broadstone EADO garage portion of the project.
  17. Does anyone know who is building this project (the general contractor)?
  18. The next two buildings that will be starting construction soon should round out Phase I. Building D: A 5-story office/retail building about 80,1470 square feet. It is planned to be 4 stories of office over one story of at-grade retail. Building H: This was originally planned as a 10-story office/retail building of about 300,000 square feet (9 stories of office over one story of at-grade office/retail). It is now a 5 level parking garage with 17,773 square feet of ground level retail. It will connect to the other parking garage that is being finished currently (Building G).
  19. PROJECT: River Oaks Multifamily (assigned prelim name) ADDRESS: 1414 Waugh Houston, TX 77019 ARCHITECT: Page OWNER / DEVELOPER: Camden Securities Company INFORMATION: 34 floor residential high-rise tower containing 302 apartments with attached 6 level parking garage for 460 cars with amenity deck on roof. It will sit on the block bounded on the four sides by Waugh Drive, Bell Avenue, Rosine Street, and Pierce Avenue. The tower is approximately 594,826 gross square feet and the tower balconies are approximately 53,020 gross square feet. The parking garage is approximately 199,290 gross square feet. Residential floors will typically have private unit balconies on east and west elevations. Ground Floor areas will include the main lobby, building tenant services, office areas, fire command, security, mail room, maintenance, storage, loading dock, building fire and domestic water room, emergency generator, building electrical rooms, and drive through drop-off/delivery roadway. Tower level 6 is a tenant amenity floor containing fitness, recreation, socializing and workspaces for tenants. Contiguous with this floor level is the top of the parking garage where there will be 29,800 square feet of exterior tenant amenity spaces such as a lap pool, spa, lawn decks, paved decks, walking paths, fitness areas, and covered lounge areas. There is also a 2,063 square foot amenity deck at level 31 for social gatherings. The staggered picture frames on the exterior of the building will be translucent glass with internal LED lighting while the perimeter of the building elevations will be porcelain paneling. I have no information on the other phases except that a mid-rise / tower will be north of this one, between Bell and Clay.
  20. You're correct. IBC (International Building Code) limits the height of wood framed structures to 5-stories. Adding floors results in added mass and wind surface area, which increases lateral forces for seismic and wind loads. Stronger structure and shear walls are need to increase strength, not to mention (accessibility) adding elevators, (life safety/egress) enclosed exit stairways, and (fire suppression) sprinkler systems throughout. You ever notice the hundreds of tiny A/C units on the rooftops of some apartments? That's because the structural dead load limitations.
  21. ARCHITECT: Gensler INFORMATION: 4-story 104,491 SF building that will include 60 shelter units on levels 3 and 4. The project also includes commercial grade food preparation, dish washing and serving facilities. Don't let the renderings fool you, there is not an outdoor terrace. That's actually just going to be a roof with screened in mechanical equipment on top.
×
×
  • Create New...