  1. From the public meeting posted above, it looks like the schedule is that construction is projected to start in 2025 and finish by 2028.  We all know these things take longer, but at least that's what we're starting with.

    Currently METRO is in project development for this route and begins engineering phase in the next year or so.

    • Like 1
  2.  

    On 12/14/2018 at 9:26 PM, wilcal said:

     

    They want to do BRT between NW Transit Center and downtown. 

     

    I think it would be tough to fit LRT on Washington.

     

     

     

    I think it would look like what was done with the Green Line on Harrisburg.....

    • Like 2
  3. On ‎9‎/‎19‎/‎2018 at 3:55 PM, Houston19514 said:

     

    Yeah, probably would be overkill to have all three lines go to Hobby.  Of course, nobody has proposed such a thing.

     

    Slide 18 of the MetroNext plan shows them proposing just that.  However, I really doubt we will ever get anything like what they have in this plan.

     

    And....looking at it further, I now can see having the red line go there so that TMC workers have a straight shot to Hobby, rather than going downtown and switch lines. But it would be good to show at least one of those three lines go elsewhere, IMO.

  4. I was really hoping that someone would create a list like this - definitely much appreciated.  It is probably asking too much, but a sixth item in an entry could identify location - it would really help those befuddled ones (like me) who can't keep track in their heads.  Something like "Location: Downtown (Main and Rusk) or Uptown/Galleria (1234 Sage). If it is too much work, then disregard this suggestion.

×
×