Jump to content

bobby123

Full Member
  • Posts

    9
  • Joined

  • Last visited

Everything posted by bobby123

  1. As far as I know that SH288 extends with grid separations from downtown all the way to FM 518. More grid separation is now in the process of construction at South Fork Drive just south of FM 518. Upgrading SH288 to freeway standard will probably continue on one intersection at a time. More frontage road is being added between Beltway 8 and FM2234. For more information concerning SH 288 corridor go to SH 288 Corridor Feasibility Study.
×
×
  • Create New...