Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 10/19/2020 in all areas

  1. Looks like activity continues unabated. It’s interesting that they are already looking at windows. I thought that would occur later in the building process. I’m assuming that is a good sign for continued development past the initial infrastructure buildout.
    10 points
  2. 8 points
  3. Just to fill in a little additional information gleaned from the Downtown TIRZ meeting: It sounds like Phoenix has the building under contract, but has not yet closed on it (as of mid-August). They are working with consultants etc to try to come up with best mix of units/pricing. The initial plan as shown above was mostly micro and studio units and a mix of affordable and market rate. They are looking at increasing the number of 1 bedroom units and also possibly increasing the percentage of affordable units. They are aiming to minimize the amount of "ask" from public bodies, hoping to not ask for any (other than HUD financing based on affordable housing and Oppportuniy Zone tax benefits). Yes, it is an Opportunity Zone project. (Contrary to the implication above, just being in an Opportunity Zone does not make a project an Opportunity Zone project; but this one is.) They are definitely addressing the student housing market. They specifically talked about it being an ideal location to provide housing for students at multiple area universities (UH-D, UH, Rice, TSU, St Thomas), Medical Center employees, downtown employees, including hotel employees...
    8 points
  4. Just a couple of shots of art that has already been installed and the entrance gardens starting to come together.
    7 points
  5. first upload was hard to see, i colored over the lines so they stand out:
    6 points
  6. https://www.houstonchronicle.com/business/real-estate/article/HP-Enterprise-campus-in-north-Houston-reaches-15658226.php#photo-19022352
    5 points
  7. thats one hell of a visual mockup. Looks like the are testing different glass types (probably trying to nail down the reflectivity balanced with the SHG and U-Vaules...)
    5 points
  8. https://www.healthcaredesignmagazine.com/trends/perspectives/face-time-tushar-gupta/
    5 points
  9. Found this video on youtube which really gives an idea of the size and complexity of this project.
    5 points
  10. From this view you can see the Hanover Autry Park as well as the Regent Square and other developments in the background.
    5 points
  11. https://www.lovettcommercial.com/properties/houston/polk---emancipation
    4 points
  12. ^^^ @MidCenturyMoldy props for the wonderful/compelling video that you supplied. the overall construction process of this burgeoning and truly important edifice... is simply AWE INSPIRING/STUNNING.
    4 points
  13. The Montrose Collective Birds-Eye View construction Progress-views from the TRAVIS.
    4 points
  14. Glass was being installed on the mock up facade. It's a bit early for that? Moving fast!!
    4 points
  15. Chain link fence around the closed Jack In The Box
    4 points
  16. Nice rendering of the remodel and floor plans from the lease brochure for the updated corner building at 11th and Studewood (formerly Dacapo's then Carmalita's). This building has sat vacant ever since a truck drove through the side of the building and started a fire in June of 2019. https://www.loopnet.com/Listing/1141-E-11th-St-Houston-TX/20976546/ The main changes from before appear to involve continuing the window's and awning around the Studewood facing side of the building, opening up the floor plan inside, and taking parking spots off Studewood to add patio seating and widen the sidewalk. It is marketed as a restuarant - 2,108 sf.
    3 points
  17. Wow, very cool ! The tall tower looks like at least 50 stories. Anyone else get that number or close to that ? This will be such a neat and upscale addition to the area. Exciting !
    3 points
  18. Flower memorial. So sad. I thought about bringing three pairs of flowers. I'm glad someone did.
    3 points
  19. Several workers on site, saw some small bore pvc pipe laying on the ground.
    3 points
  20. I keep coming back to this thread thinking someone finally posted the renders or the model.
    3 points
  21. Looking at google earth, there is a clear shot from May of 2020 in which the buildings laid out??
    3 points
  22. I am soooo excited about the opening of this building and yet I have no idea how long it will be before I actually get to see it in person. 😩
    2 points
  23. Sorry for the delay. Here are some pics from One Park Place on 9/27.
    2 points
  24. IMO the whole of Buffalo Bayou from Downtown to Shepherd is a park, or park like environment, which is one of the major selling points for the multiple developers who are currently building apartments and mixed use in the area. (The Allen, Regent Square, Hanover Autry Park, and Alta River Oaks) My thoughts on nicely developed mixed use in the area are as follows:
    2 points
  25. Rosewood Houston now expected to open by 2024 https://www.rosewoodhotels.com/en/houston
    2 points
This leaderboard is set to Chicago/GMT-05:00
×
×
  • Create New...