  1. Actual demolition has started.
  2. So it's going to be a gas station? Izzi Mart is the same name used by the new station up on 26th.
  3. I agree that Cooking Girl is great, but aren't we set for Chinese Restaurants in the neighborhood? Rice Box, Heights Asian Cafe, Be More Pacific, Mala Sichuan... How about a nice Indian place, with table cloths and table service?
  4. My wife and I looked in the windows yesterday. There were bottles behind the bar and tables with place settings. Maybe it was for a photo op or maybe they're getting ready for a soft opening.
  5. All kidding aside, this is always going to be a battle. Humans like to build next to rivers and bayous for functional and aesthetic reasons, but rivers hate to stay in their banks. They meander. So this project will progress and we'll gain new bayou trails and nice views because we have the technology to do so, but there will be consequences. Bulkheads and embankment maintenance will be needed and there will be changes to the sediment deposition that no one can predict. But I'm all for this project, do it. Just keep in mind that building along a bayou is never a one-and-done proposition. We should expect that there will be failures and that things will need to be redone from time to time. As a geoscientist I'm saying that the need to redo things in the future is a foreseeable event that needs to be planned for and budgeted. The need to make future changes are not "failures" per se, but rather just a cost of doing business. So don't be surprised or too harsh on the developers when something big or small detaches and slides into the bayou during a high water event. Anyone who thinks that this can be prevented 100% is either an over-confident engineer and/or lacks a healthy respect for the power of water and nature to reshape our landscape.
  6. They left the lights on last night so I was able to get a picture of the new trail segment. It looks very far along, most of the curbing is in, there's gravel down everywhere that I could see and the bridges are coming along. And the lights work.
  7. It looks like they may have started on the bridge railings of the SL trail reroute. Here is a not-very-clear photo of what may be the start of the new railings. The best that I could tell, it is horizontal metal bars/tubes. I couldn't really tell what was going on with the vertical supports. They've also installed a lot of the trail curbing and filled some of the trail with crushed granite.
  8. No visible activity in a while, looks like it's still available.
  9. Here are the results of the weekend closure of Memorial Drive. They lifted in the spans for the three bridges necessary for the rerouting of the SL jogging trail. These photos are of the longest spans where the trail will cross the big gulley. I was disappointed at first that they used such generic looking concrete spans, but then I realized that a) once the trail is rerouted no one will be able to see them from this vantage point and b) the trail users will be above the decking so they won't be able to see them either. So now I'm just hoping that they pick nice materials for the decking and the bridge rails. Based on how nice that the Eastern Glades turned out, I'm not really worried.
  10. Work is well underway on the next re-route of the Seymour-Lieberman running trail. It looks like they are going to replace those last few hundred meters of the trail that run right up next to Memorial Drive just east of the land bridges. The trail is going to be moved north into the park 20 or 30 meters, but that means that the trail will now have to cross that big gulley. Most of the trees have been cleared so they can start working on the bridge that will be needed.
  11. I vote to excavate the entire plaza down to bayou level and have a bayou spur run under the street and come up to the front of the building like the San Antonio Convention Center.
  12. My wife and I ate there on Saturday and it was very good. But be warned, the dining room is small with only about six tables. It was crowded so we ended up eating outside at a table that was basically protected from the wind, but it was still kinda cold.
  13. A little progress on the bike trail/new park downtown.
  14. They opened the jogging trail reroute. This new section runs about 100 m north of the old trail that is directly adjacent to Memorial Drive. The old trail is going to need to be extensively modified or eliminated because it must be in the way of the downslope of the bridge. The new section is nice. It runs though the woods instead of right next to the street with the sounds of the cars, the exhaust and the general unnerving feeling of being that close to the fast moving cars on Memorial. Unfortunately it doesn't totally eliminate all of that section. There is still a part right by the road where it will be difficult to move the trail because of a gulley and where the golf course comes pretty far south. But it is way better than it used to be.
  15. They started on the retaining walls over the tunnel ends. This was the far east end of the eastbound lane. They were pouring concrete on the Wednesday night before Thanksgiving.
×
×