Jump to content

Michael E. DeBakey High School For Health Professions At 2545 Pressler St.


OkieEric

Recommended Posts

Old Braeswood POA sent out a notice for a meeting regarding construction of the new DeBakey High School in the medical center.  Per the notice it will be built "on the site of the Hornberger Conference Center."  I guess this means the last piece of the Shamrock is coming down?

 

Construction is to begin later this year

 

I looked around for some renderings and could only find something on the HISD blog:

 

http://blogs.houstonisd.org/news/2014/06/03/video-highlights-how-design-is-shaping-up-for-new-debakey-high-school/

  • Like 1
Link to comment
Share on other sites

Well now I'm confused.  This link does show 2160 Pressler but per google that is around Shriner's and the HCC building area.  The HCC building is 1900 Pressler so not sure I trust google maps for Pressler addresses

 

http://www.houstonisd.org/Page/71974

 

The link says they are working with the Texas Medical Center to find a new home.  The actual video I linked looks to be filmed inside of Hornberger and they say something about being on the site of the new campus

 

Also, Trevisio's website states the conference center closed on May 1, 2014:

 

http://www.trevisiorestaurant.com/Hornberger_center.html

 

I also would hope the Old Braeswood POA would have been given the proper location of the new school

 

 

EDIT:  OK, in looking over some of the Project Advisory Team (PAT) minutes it sounds as if the parking garage will stay, just the conference center itself will likely go.  Plus if you watch the video it's clear that the garage on W Holcombe will remain as it's in the background of some of the renderings.  Looks like quite a bit of the "Shamrock parking lot" will actually remain

 

 

Edited by OkieEric
  • Like 1
Link to comment
Share on other sites

  • 2 weeks later...

I didn't attend the meeting but Old Braeswood POA sent out a summary that confirms the location as the Hornberger Conference Center.  From the email:

 

Original plan was to add floors to the parking garage, but it was not feasible

 

Site will be 2.5 acres bounded by Holcombe, Pressler, Main St, and Montclair

 

The school will consist of 2 5-story structures connected by a 4 story atrium and have room for 900 to 1000 students.  Construction will start in November

 

The TMC parking garage on Holcombe will be renovated after school is built

 

 

  • Like 2
Link to comment
Share on other sites

  • 6 months later...
  • 7 months later...
  • 1 month later...
  • The title was changed to Michael E. DeBakey High School For Health Professions Renovations
  • 2 months later...

Saw the crane boom from a distance and went to see what they were doing. Turns out they are removing and replacing some duct work on the chiller. Talked with the ground man who is actually an operator too. His crane is in Baytown at the old Bayer plant ready to be used elsewhere but just not today. He also mentioned one of their cranes is taking down a tower crane at Studemont and Washington Ave. There are no tower cranes near that intersection so I'm not sure what tower crane he was talking about.

kiDQYCy.jpg

  • Like 1
Link to comment
Share on other sites

  • The title was changed to Michael E. DeBakey High School For Health Professions At 2545 Pressler St.
  • 4 months later...

A JLL truck was on site today. I wonder if it’s simply maintenance related or if there’s something else happening. 

Their surface parking lot will eventually be developed into something more useful. Most likely a parking garage but what would also make sense is a new tower with the podium serving as parking.

Link to comment
Share on other sites

  • 1 year later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...