Skyhouse Houston II: Multifamily At 1044 Jefferson St.


lockmat

Recommended Posts

Update from today:

 

http://s7.photobucket.com/user/brijonmang/media/skyhouse1_zps4821c0ce.jpg.html'>skyhouse1_zps4821c0ce.jpg

 

I think they have gotten into turbo-time seeing as they were just pouring the columns for the second floor yesterday and are now laying forms for the third floor.  I think the main reason they are able to go so fast is because of the forms I circled in red.  They arrive by semi and the crane is able to lift and place huge sections at a time instead of having to build them all by hand on site.  

 

The area in green is some graffiti I noticed on the Savoy.  Going back I saw that it happened on the night of Friday, June 28.  Can't make out any people on the roof in the time lapse shots but when the sun comes up, the paint is there.

  • Like 4
Link to comment
Share on other sites

The area in green is some graffiti I noticed on the Savoy.  Going back I saw that it happened on the night of Friday, June 28.  Can't make out any people on the roof in the time lapse shots but when the sun comes up, the paint is there.

 

If you look closely you can see it was done by "Remuv". Houston Press called this guy's tags some of the lamest in the city:

 

http://blogs.houstonpress.com/artattack/2012/09/remuv_lastest_contender_for_ho.php

Link to comment
Share on other sites

Modular formwork (premade formwork). Yep that'll speed things up. 

 

How does that work? Are the modular sections actually part of the building or just something to hold up the next floor while it is poured and drys? They look like a solid platform on top of six feet of metal laticework, so it seems like it would be too bulky to leave in place and too cumbersome to remove after the pour.

  • Like 1
Link to comment
Share on other sites

Look at post number 151. Thats your form work. The truss elements are only 3-4 feet tall (hard to tell because of the fish eye lenses). You can also tell from the picture theyre not  (completely) assembled for the entire floor. 

As to how they work: Components are assembled together before hand to form a gang form. A gang form is typically defined as a group of unit forms tied together and lifted by crane to the proper spot. They probably have a crew assembling the gang forms on the ground, or offsite. Crane lifts into the correct spot, Concrete pour occurs after rebar placement, and after sufficient curing (not drying) then the components are broken down again, staged, and flown (slang for lifting with crane) down to the ground where the process is repeated. They probably have enough formwork for more than 1 floor, so while things are being staged to take down to the next floor, they probably have the gang forms for the next floor ready to go. 

Here's a video on how they do it for wall construction: 

 

Keep in mind, the dissembling process for wall construction may be different than slab construction. 

 

 

Now, I dont know their formwork system or civil design. So what i'm saying is a bit speculative on my part. Please keep that in mind. 

  • Like 2
Link to comment
Share on other sites

  • 2 weeks later...

It's been a couple of weeks so I figured I'd add a new picture from the webcam:

 

skyhouse_zpsc1a408af.jpg

 

They are putting the forms in place for the 5th floor.  You can see how they operate so fast now.  When it is time to move up a floor, they simply pull the forms out from the floor below it and move it up one level.  They pour 1/3 of a floor plate at a time, and then following day come back to pour the columns of the area where they just poured the floor.  

Edited by brijonmang
  • Like 4
Link to comment
Share on other sites

It's been a couple of weeks so I figured I'd add a new picture from the webcam:

skyhouse_zpsc1a408af.jpg

They are putting the forms in place for the 5th floor. You can see how they operate so fast now. When it is time to move up a floor, they simply pull the forms out from the floor below it and move it up one level. They pour 1/3 of a floor plate at a time, and then following day come back to pour the columns of the area where they just poured the floor.

Thanks for the update.

Seeing the Savoy being gutted is makin me hot though!

Link to comment
Share on other sites

The Beaconsfield looks so lost in that pic. I've always marveled at that building's ability to have survived while the old Savoy and everything else around it was removed. I think SkyHouse, although generic in design, will function as nice infill. I'd like to see this photo angle again when the tower is finished.

  • Like 1
Link to comment
Share on other sites

the best part of the garage! heh.. too bad they couldnt put some storefronts on the bottom of Skyhouse along Main. i guess they wanted to put a nice entrance there instead.

 

They did.  Most of the retail space is in the apartment building, not the parking garage and more than 1/2 of the Main Street frontage is devoted to retail.   (At least that's what Wulfe & Co. seems to think.)

Link to comment
Share on other sites

The only problem is that retail is facing an ocean of parking lots, but oh well, I cant complain.

 

The rendering above makes it look like the retail will be on the North side of the parking structure, in which case it will face another new apartment building:

http://www.houstonarchitecture.com/haif/topic/28307-alliance-downtown-5-stories-207-units/

http://www.houstonchronicle.com/business/real-estate/article/Houston-s-apartment-boom-focuses-on-urban-scene-4619878.php?t=445cfc44ffb05374ef

 

Edited by Alec
  • Like 1
Link to comment
Share on other sites

The rendering above makes it look like the retail will be on the North side of the parking structure, in which case it will face another new apartment building:

http://www.houstonarchitecture.com/haif/topic/28307-alliance-downtown-5-stories-207-units/

http://www.houstonchronicle.com/business/real-estate/article/Houston-s-apartment-boom-focuses-on-urban-scene-4619878.php?t=445cfc44ffb05374ef

 

 

I didn't think about that even though I knew that Alliance was putting up those apartments on the adjacent block. I wonder if that was planned!

Link to comment
Share on other sites

The rendering above makes it look like the retail will be on the North side of the parking structure, in which case it will face another new apartment building:

http://www.houstonarchitecture.com/haif/topic/28307-alliance-downtown-5-stories-207-units/

http://www.houstonchronicle.com/business/real-estate/article/Houston-s-apartment-boom-focuses-on-urban-scene-4619878.php?t=445cfc44ffb05374ef

Totally forgot about this one. Good lookin out.
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...