Jump to content

yaga

Full Member
  • Posts

    75
  • Joined

  • Last visited

  • Days Won

    1

yaga last won the day on February 15 2013

yaga had the most liked content!

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

yaga's Achievements

(7/32)

49

Reputation

  1. Next Wednesday May 31st at the City of Houston Economic Development Committee meeting, Houston Airport System Director Mario Diaz along with United Airlines will be presenting their IAH Terminal B Redevelopment Program. Curious to see if they will scrap the fairly new B South holding room set up or just focus on redeveloping the north side banjos.
  2. In today's City of Houston Economic Development Committee meeting, Houston Airport System director Mario Diaz mentions that they are finalizing talks with United about a massive overhaul and redevelopment of the entire Terminal B complex.
  3. 2 people might be an exaggeration but it's not that wide when walking between trees.
  4. Is anybody else disappointed with the width of the sidewalks? For a such a major project on a signature boulevard, you would think they would build a sidewalk that could accommodate more than 2 people walking side by side. I guess it's an improvement over what was there before...
  5. Presentation of Terminal D expansion (slides 19-23) and potential Termainal A modernization (slides 24-31). https://d14ik00wldmhq.cloudfront.net/media/filer_public/1e/94/1e94223d-bf7f-4466-8e2f-90297f3c6ce6/has_rtb_presentation_20180808.pdf
  6. According to the Colliers Q2 2018 Buckhead submarket report, Buckhead has 21.8 million square feet of office space. The West Loop submarket has 23.9 million sqaure feet so it's not too far off. https://www2.colliers.com/en/research/atlanta/2018-Q2-Office-Buckhead-Atlanta-Submarket-Report
  7. Metro unveiled their Preliminary Long Term Vision for Projects through 2040 on Thursday July, 2018 at the MetroNext Board Workshop. Perliminary Long Term Vision (discussed at the 17:30 mark) - Pretty much a pipe dream and estimated to Cost $35 Billion - 100 miles of Light Rail (to both IAH and Hobby, Inner Katy Line to High Speed Rail Station at Northwest Mall) - 90 Miles of BRT Forward Plan A (discussed at the 1:03:00 mark) is the more optimistic plan with the Metro receiving higher funding levels - 12 miles of Light Rail (Red & Purple Extensions to Hobby; Red line extension to Tidwell) - 34 miles of BRT (University Line, Inner Katy, Uptown Extension) Forward Plan B (discussed at the 1:22:00 mark) is the pessimistic plan with Metro receiving lower funding levels - 1 mile of Light Rail (Red line extension to Tidwell) - 11 miles of BRT (Inner Katy, Uptown Extension) Video http://ridemetro.granicus.com/MediaPlayer.php?view_id=5&clip_id=1651
  8. From www.airliners.net At a recent event in Houston, Scott Kirby told attendees in the coming years UA could add new nonstop service to 20 new cities from IAH including international destinations. He also stated UA is growing IAH and expects to hit 700 flights a day up from 540 although no time frame was given for when we should expect IAH to hit the 700 mark.
  9. New Building to House Project Management Operations Important Stop on IAH Terminal Redevelopment Program Journey The scope of the project includes: New Terminal D facilities Terminal roadway improvements New airside packages (ramp areas) Training center Federal Inspection Service (FIS) modifications New Terminal C North, ramp and apron completed by United Airlines Enabling projects: Program Management Office building, site utilities, and Terminal D baggage handling system modifications.
  10. https://urldefense.proofpoint.com/v2/url?u=https-3A__www.bizjournals.com_houston_news_2017_11_17_exclusive-2Dmedistar-2Dto-2Ddevelop-2Dhealth-2Dcare-2Dtower-2Din.html&d=DwIFAg&c=Nwf-pp4xtYRe0sCRVM8_LWH54joYF7EKmrYIdfxIq10&r=blKN8VopvORAS0wfhRwbytKy3LX7VRXXkSGAZ5grTVE&m=oKU_5Ug6V8IJKYixwlZLicFxT7bwrDWZ7k3QPqzFwBI&s=uDs1_LFkk24xzLzhNZ31xvHRCcLU97r55jO4sstW_H0&e= New Design: http://media.bizj.us/view/img/11203455/innovationtower.jpg
  11. If I were a betting man, I would put my money on this being an Omni. Most other convention hotels and mid level hotels are already in the area or have a proprety downtown except the Omni who only has 2 other properties in Houston (galleria area and energy corridor). Also from what I remember they were in the running for the second convention center hotel but were not selected so there was interest in downtown Houston.
  12. Part 1 Part 2 Details -15 wide body gates including 4 A380 gates (2 airlines currently in discussion with bringing A380 to IAH) - new terminal to replace existing terminal D and northern pier of terminal C - project to be completed in 6 phases - anticipated groundbreaking Summer 2015 - completion in 2021
  13. Discussions have begun with United and the foreign flag carriers at IAH to begin design and cosntruction of a completely new terminal to replace existing Terminal D. This was announced today at the State of the Airports presentation at the Greater Houston Partnership luncheon by City of Houston Aviation Director Mario Diaz. The vision for the project will be announced at another event this evening hosted by HAS. Specific details of the new terminal will be presented at next year's State of the Airports address in 2015. A few renderings were included in the presentation on slides 37 and 38 and the discussion of the new terminal begins on slide 10 in the presentation transcript.. The presentation and the transcript can be found on the link below: http://www.fly2houston.com/newsroom-Presentations
  14. The IAH twitter handle (@IAH) has been posting pictures Today of the Terminal B new south concourse which will be open to the public over the next few weeks. I tweeted the following question "what is the status of the phase 2 expansion of terminal b for the north side gates?" and this was their response: "The construction will begin later this year" Take that for what its worth. I'm not sure if the person tweeting for IAH is a reliable source, but you would think the person responsible for social media with the airport would be in the know of certain information. Hopefully its a sign of good things to come.
×
×
  • Create New...