I-45 Inside Loop


samagon

Recommended Posts

didn't see a topic for this, but I think I recall someone mentioning it somewhere, at some time, so I probably just didn't search thoroughly enough.

 

From just east of Lockwood to the loop they are doing extensive work on the feeder roads and they are adding connectors from gulf SB to 610 SB, and from 610 NB to gulf NB.

 

Are they doing more to the freeway? Is the reconfiguration of spur 5 part of this construction? As a resident of the area that is inconvenienced by this, what is the scheduled timeline?

 

I can only find information on transtar about what all's closed, I can't find anything else.

Link to comment
Share on other sites

It looks like work on curbs and sidewalks.  No completion date though.

 

Quote

 

Project Summary
Show or Hide All Tables
Project Summary
Last Updated: 1/16/2017
Project ID 050003580 District Houston
Highway IH 45 Project Length 2.319 Miles
From Limit NB & SB FRONTAGE RD FROM SCOTT ST County Harris
To Limit WAYSIDE DR Bid Received Date 2016-Mar
Description Fast Track Concrete Pavement, Concrete Curb And Sidewalk Project Class RER
Project Note TxDOT Design Strategic Score 0.00
    Total Score 0
Quote
 
Project Construction
Last Updated: 1/16/2017
Notice to Proceed Date 6/17/2016 Percent Time Used 18.46%
Work Begin Date 11/1/2016 Percent Budget Used 13.65%
Estimated Completion Date TBD    


 

 

Link to comment